City of Colton

La Cadena Drive Over Santa Ana River Bridge Replacement Project

Arellano Associates, as part of CHA Consulting's team, was selected to support the City of Colton's La Cadena Drive Over Santa Ana River Bridge Replacement Project, which will replace the existing bridge over the Santa Ana River with a new structure featuring wider vehicle lanes, buffered bike lanes, sidewalks, and a curbed median, along with associated utility relocations and retaining wall construction. Arellano will serve as the integrated public outreach partner to the construction management team, translating complex construction activity into clear, timely communications for residents, businesses, motorists, bicyclists, and community stakeholders throughout construction.

Project Manager: Thomas Reese

Contract Value: $273,000

Prime: CHA Consulting, Inc.

City of Redondo Beach

Riviera Village Pedestrian and Multi-Modal Enhancements Project

As part of CR Associates' team, Arellano was selected to support the City of Redondo Beach's Riviera Village Pedestrian and Multi-Modal Enhancements Project, a Living Streets-focused design effort to reimagine Catalina Avenue from Avenue I to Palos Verdes Boulevard with wider sidewalks, new bike facilities, traffic calming, parking reconfiguration, and streetscape improvements that strengthen the sense of place in the Riviera Village business district. Arellano will lead a place-based public outreach program tailored to the Village's business and visitor community, engaging local business owners and shoppers through targeted canvassing, stakeholder meetings, and pop-up events at the Riviera Village Farmers Market and other high-traffic areas.

Project Manager: Jessica Harleaux

Contract Value: $150,000

Prime: CR Associates

City of Pasadena

Rose Bowl Multimodal Olympic Route

Arellano Associates, as part of Dokken Engineering's team, was selected to support the City of Pasadena's Rose Bowl Multimodal Olympic Route project, which will design and deliver active transportation improvements connecting the Metro A Line's Memorial Park Station to the Rose Bowl ahead of the 2028 Olympic and Paralympic Games. The route runs along Holly Street, Pasadena Avenue, Walnut Street, and Orange Grove Boulevard, and may include new Class II and Class IV bikeways, upgraded ADA ramps, curb extensions, and protected bicycle intersections to improve walking, biking, and transit access to the venue during the Games and for years beyond. Arellano will lead a community engagement program built around the corridor's diverse neighborhoods.

Project Manager: Edna Jimenez

Contract Value: $144,000

Prime: Dokken

More AA Wins!

On-Calls

  • City of Tustin Pre-Qualification for Professional Engineering & Technical Services 

  • Metro On-Call Regional Rail PM & Support Services 

  • Port of Long Beach On-Call CEQA, NEPA

  • SCRRA On-Call Planning Services

  • Ventura County Airports On-Call Planning and Architecture/Engineering.